Location: Johnstown, Ontario Owner: Giant Tiger General Contractor: M.P. Lundy Construction Engineer: CIMA+ Architect: GKC Architects
Project Overview
The 550,000-square-foot Giant Tiger Distribution Centre serves as the company’s primary logistics hub, featuring warehouse, dock, and office facilities designed for maximum efficiency and performance.
Scope of Work
DILFO completed the full mechanical scope including HVAC and plumbing systems. The installation was optimized for industrial reliability and operational efficiency to meet the demands of large-scale distribution.