As part of the Zibi redevelopment along the Ottawa River, Block 211 stands as a model of sustainable, high-performance design. This eight-storey, 200,000-square-foot LEED Class A office building was delivered through a Design-Assist approach, with DILFO acting as Prime Contractor under EddyLands Construction.